A Rowan company - serving Santa Clara, CA

KraftMaid Home Additions & ADU Nationwide

Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

Your dream remodel for as low as $199/month*on approved credit; ask for current terms
Styles & brands we work with

Kitchen remodeling
Kitchen remodeling
Bathroom remodeling
Bathroom remodeling
Home additions & ADU
Home additions & ADU
Roofing
Roofing

Windows & doors

Driveway & pavers
Driveway & pavers
Fence
Fence

Before & after – our own jobs

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

KraftMaid Home Additions & ADU: The Santa Clara Owner’s Guide

We stock and install KraftMaid-compatible cabinet systems for home additions and ADUs throughout Santa Clara, with typical installed project ranges from $45,000 to $130,000 for additions and $90,000 to $220,000 for standalone ADUs. Most Santa Clara homeowners who call us notice the problem during the planning phase: their existing KraftMaid kitchen or bath cabinets don’t match what’s available now, or the original specs from a 2015-2020 install are discontinued. In the Rivermark and Westwood Oaks neighborhoods, we regularly see owners trying to extend a KraftMaid Maple or Cherry line into a new addition only to find the finish codes have changed, leaving a visible seam between old and new.

Call (669) 259-1843

Which KraftMaid Models This Applies To

KraftMaid organizes its cabinetry by door style, wood species, and finish code - not by a single model number you can punch into a database. The critical identifier is the six-digit finish code stamped on the hinge cup or the interior side of a drawer front. For Santa Clara additions built between 2015 and 2022, we’re most often matching the Canvas, Dove White, or Peppercorn painted finishes, or the Natural Maple and Cognac Cherry stains. The Vantage line (frameless, full-overlay) differs from the Portfolio line (framed, partial-overlay) in hinge boring pattern and door reveal - a 1/8-inch difference that becomes a 3/4-inch gap at the corner if mixed.

OEM KraftMaid doors and drawer fronts are still available through MasterBrand’s dealer network with a 4-6 week lead time. We also source from Wellborn and two vetted custom shops in San Jose that can color-match discontinued finishes within a Delta E of 2.0 - close enough that the seam falls under a pendant light rather than across it. The aftermarket route cuts wait time to 10-14 days and typically saves 15-20% on door and drawer front costs, though we always flag when the original box construction (3/4-inch plywood vs. 1/2-inch furniture board) needs to match for hinge screw retention.

Signs Your KraftMaid Home Additions & ADU Is Failing

Professional contractor installing a white quartz countertop during a kitchen remodel.
Signs Your KraftMaid Home Additions & ADU Is Failing
  • Finish mismatch between old and new cabinets. The original KraftMaid cabinets have yellowed or faded in Santa Clara’s south-facing exposures, while replacement doors from the same code look noticeably different. UV degradation on water-based topcoats accelerates above 85°F, which happens regularly in Santa Clara’s July and August afternoons.
  • Drawer boxes separating at the dovetail joints. KraftMaid’s all-wood drawer boxes use half-blind dovetails that can dry out and loosen in low-humidity conditions. We see this most in ADUs where the HVAC is undersized and interior humidity drops below 30% for weeks at a stretch.
  • Hinge cups pulling out of the door bore. The 35mm hinge cup bore in MDF or particleboard doors loses grip after repeated cycling, especially if the original install used standard-length screws rather than the deeper-thread version KraftMaid specifies for doors over 24 inches tall.
  • Soft-close mechanism failure in drawers or hinges. The Blumotion or Whisper-Touch inserts lose damping fluid after 7-10 years of daily use. In Santa Clara’s hard water areas, mineral buildup on the piston shaft accelerates seal wear.
  • Sink base cabinet floor swelling or delamination. KraftMaid’s standard sink base uses a 1/2-inch melamine floor with a perimeter water seal. When that seal is compromised by a slow drain leak, the particleboard core swells upward and pushes the finish layer into a waffle pattern we call “alligatoring.”
BeforeBefore
AfterAfter

Replacement Cost & What’s Included

Component Price Range (Installed) What’s Included
Door and drawer front replacement (color-matched) $4,000-$13,000 Removal, disposal, new hardware, alignment, 365-Day Done Right Promise
Full cabinet box replacement (same footprint) $8,000-$22,000 Demo, new boxes, countertops, plumbing reconnect, permit if required
Home addition with KraftMaid cabinetry $45,000-$130,000 Framing, electrical, HVAC rough-in, cabinets, counters, fixtures, final inspection
Standalone ADU with full kitchen/bath $90,000-$220,000 Foundation to finish, including Santa Clara permit and utility tie-in

What drives the range: finish grade (standard paint vs. glazed or distressed), box construction (plywood upgrade adds 18-25%), and whether the Santa Clara permit requires seismic bracing or fire-rated assemblies for ADUs over 800 square feet. Under Clause 1 of the Haven Standard, we deliver a written price before any work starts - every line item visible, no “allowances” that balloon later. The 365-Day Done Right Promise covers labor and installation; manufacturer defects on KraftMaid components are handled through MasterBrand’s limited lifetime warranty.

DIY or Call Us?

Professional contractor applying thin-set mortar to kitchen backsplash for tile installation
DIY or Call Us?

There’s safe checking, and then there’s the point where a mistake costs more than the call.

An owner can verify the finish code, measure door openings (width first, then height, in inches, to the nearest 1/16), and photograph the hinge type. That’s useful information to have ready. What goes wrong: ordering doors without accounting for the overlay (how much the door covers the face frame), mixing Vantage and Portfolio hinge boring patterns, or assuming a color match from a screen-rendered swatch. In Santa Clara’s light, a “warm white” can read pink at 4 p.m. and green at 10 a.m.

Structural work - removing a load-bearing wall to open the kitchen into a new addition, or tying ADU utilities into existing sewer lateral - requires permits, inspections, and an understanding of Santa Clara’s specific setback and parking requirements for ADUs. Measure twice, document once, and never assume the last contractor left things square. For anything beyond a straight door swap, call (669) 259-1843 and we’ll schedule a free estimate with a written scope.

Get the price in writing before anything starts.A real person answers, day or night.
Call now

FAQs

Need Construction help in Santa Clara? Licensed & insured · Free on-site estimates response · free estimates
Call (669) 259-1843
Local Service Coverage

Request a Free Estimate in Santa Clara

Tell us what you need - Rowan Construction Group Santa Clara responds fast. No obligation.

When you submit this form, you agree to our Privacy Policy and agree to be contacted by telephone, text message, or email about your request, including by the independent contractors we may refer it to.

Prefer to text? Text Us
Call Now - 24/7 Dispatch